Chelsea Town Hall

We were employed by a large PLC building company based in London to supply a “temporary roof” to the Old Town Hall in Chelsea..

You can see by the design element of the scaffolding, that on the two sides of the building the scaffolding was suspended without touching the ground.

We also used a lightweight system roof to help with the loading calculations, and for erection speed.